The leader of vocation criterion
   
  
     
 
 Concept | AdvantageDevelopment | Organization | History | About yourgood
   
   
 

YourChoice advocates originality and YourChoice obtained tens of patent designs about structure and utilities, making it standing at the leading position of the upholster industry nationwide. The intelligent and perfect combination of high partition computer-aided design software (HPH) system and project ERP management system developed by YourChioce provide the effective tools making complicated measuring design process, communication process and construction process into careful and highly efficient flow management system. This makes YourChoice management team, design team and construction personnel work more efficiently and quickly respond to the requirements all over the world, and reduce the error rate to the minimum.

 
YourChoice Flow Management System :
 
  1.Quickly prepare the ichnography and solid drawings according to the partition project requirements.
2.Automatically convert ichnography and solid drawings into 3D modules and provide modeling interface for the 3D effect drawings.
3.Automatically translate drawings into word format to provide data-conversion interface.
    Project ERP special management includes
   

ERP project quotation system
  1. Translate documents created with high partition computer-aided design software into database.
  2. Automatically generate project quotation form.
  3. Provide three kinds of quotation forms to meet customers' requirements
     3-1 Itemized Material Quotation
     3-2 Material Quotation Statistics
     3-3 Summary of Project Quotation

Project Material System
   1.High partition computer-aided design software (HPH) generate the construction drawings and the conversion interface.
   2.ERP material-computing module automatically calculate the project materials with HPH drawing information.
   3.Provide List of Project Material and Summary of Project Material

Project Scheduling Management System
   1.Set up construction team.
   2.Plan construction time of different stages.
   3.Arrange all required resources at site.
   4.Pre-evaluate risks of construction site.
   5.Follow up the project schedule.

ERP Material production management system
   1.Manufacture Resource Planning (MRP) System
   2.Factory Production Capacity Plan
   3.Production Site Reporting System

Project closing management
   1.Analyze whether the project materials is used in right way or not.
   2.Analyze whether there are delays in the project or not.